Today was pretty simple really. We made a "best attempt" at getting the steel square and then added the floor joints for our ensuite and the entrance of our room. Because we used an extra steel beam at the ensuite boundary we were able to run the joists perpendicular to the main room. This allows the plumbing to go towards the garage without cutting any joists. It also allows us to use smaller joists and get the ensuite floor at the same level as the bedroom after the tiles are added. Everything looking good.