Sunday, 5 June 2011

Tuesday 31st May - Day 50

If we had a recycle day last week, today was rework day. The first order of the day was to move the kitchen window 170mm. I set the widow to be the centre of the bench but the sink is not centered on the bench. Worse yet, because the window is bigger than the original, the last cupboard wouldn't fit. As such the move was necessary. Next on the rework list was the stair landing. We needed to have the steps in front of the window far enough away so that we can open the louvres easily. The choice was a smaller step width or move where the corner joins. The best choice was to rework the landing.
On a positive note we did a bit more of the cladding for preparation for the Blueboards and finished the frame in front of the garage.

No comments:

Post a Comment