Sunday, 24 July 2011

Wednesday 20th July - Day 84

 I needed to complete all my wiring before any plastering can occur.
The rumpus room surround sound wiring aand all (most) the network cabling is done.


The laundry needed a false ceiling to be able to hide the pipes and also cater for the laundry chute from the girls bathroom.

The upper north wall needed a 30mm packer to allow for the difference between the ground floor where there is hardwood (100mm) and weatherboard (20mm) compared to the 90mm framing timber available today.