Saturday 1st October. All hands on deck

Many thanks to Michael, Clay, Stephen, Gary and Adrian for coming to assist me with the pouring of the concrete out the back. As we only needed 1.8 cubic metres, it wasn't worth getting a pump so we used wheel barrows to get it out the back. Interesting that the concrete companies charge $3 per minute for anytime greater than 30 to 45 minute unload times. We just scrapped in with 45 minutes :).
Of the 5 wheel barrows we had on site, 2 naturally had a flat tyre. At least Murphy didn't get his way with the other 3..