OMG it was freakin' freezing today. While the roof was on and pretty much leak free, it was still raining inside bceause it was coming sideways. The windows didn't get any work done on them but we did manage to get the stairs started. The landing and first step down was designed and built to maximise head space below. Fairly simple but time consuming as my hands really didn't want to work.
 |
| First window and door installed |
We did have one visitor today; Pat from next door popped in to say she had taken a few pictures of us during construction. Another one of our amazing neighbours. Unfortunately they are leaving the Alameda family to head for Narrabeen next year. Pictures from Pats place next door.
 |
| A much better option |
No comments:
Post a Comment